Our Clients

Our clients are companies who develop their own products or services, in total or in parts, whether they are mass consumer products or specialized ones, software or scientific apps, buildings or infrastructures or more. These “products” all have something in common: they are high-tech and because of their complexity, they require the use of multidisciplinary teams. Also, the companies who use our services must deliver a more and more high performance complex product, in delays getting shorter and shorter. Thus, these companies must have a value management process to manage their products and a more efficient and adapted product development process. All companies who have a significant number of engineers/designers/technicians and who fell the pressure to deliver project within tights budgets, and still wanting to satisfy clients needs, these companies can improve the performance of their design team by learning the tools of value management.

Construction and Infrastructures

Water Treatment

  • VE of the waste water treatment plant and pumping station, cities of Drummondville and Chicoutimi (1993)
  • Building and services for the drying of the sludge (1993)
  • Niagara region, VE of the potable water and waste water networks in the municipality of Wainfleet (2007)

Cities of Gatineau and Ottawa

  • Analysis of the community needs for the new Ottawa-Gatineau bridge (2011-12)

City of Granby

  • VE of the renovation project for the Notre-Dame church, to be converted in a multi use venue and training venue for the CEGEP (2016)

City of Laval

  • Value analysis of the Simonne-Monet-Chartrand Community Center (2019)
  • Value Analysis of the Armand-Frappier Bioscience Interpretation Center (2018)
  • Value Analysis of the Place Bell project (2012)
  • Value Analysis of the aquatic complex (2014 feasibility stage, 2017 step plans and specifications)

City of Montreal

  • Choix de technologie selon la valeur pour le projet de rénovation de l’Hôtel de Ville (2019)
  • Analyse de la valeur du projet de réfection de la Rue Notre-Dame Ouest (2019)
  • Analyse de la valeur du projet de Revitalisation du Pôle Gadbois, étape faisabilité et étape avant-projet définitif (2018 et 2019)
  • Analyse des besoins du nouveau Centre de Formation du SPVM (2018)
  • AV du projet de métamorphose de l’Insectarium, étape Concept (2016) et étape Plans et Devis (2017)
  • AV du projet de Migration du Biodôme (2016)
  • AV du projet de rénovation des terrasses de la place Jacques-Cartier (2016)
  • AV du projet de construction – complexe sportif de l’arrondissement St-Laurent (2010)
  • AV de projet de construction de la nouvelle bibliothèque de l’arrondissement St-Laurent (2009)
  • AV de l’échangeur Henri-Bourassa / Pie-IX (2008)
  • AV de l’échangeur Côte-des-Neiges / Remembrance (2008)

Quebec City

  • Needs analysis of a new public market (2017)
  • VE of the renovation and construction of the House of Literature (2012)
  • Needs analysis and Ve of the municipal garage in Charlebourg (2012)
  • VE of the construction of an annex to the Arpidrome (2013)

Systra Philippines

  • Analyse de la valeur du projet de remise en service d’une ligne de train de Manille vers le Nord (2019)
  • Analyse de la valeur du projet de construction d’un port de conteneurs (2019)
  • Analyse de la valeur du projet d’expansion du service des eaux potables et usées (2019)

Montreal Airport Authority

  • VE of the domestic arrival renovation (1993)
  • Needs analysis and Ve of the transborder departure zone (1994)

Quebec Airport Authority

  • VE of a shared services building (2013)

GTAA

  • VA of the security increase project at Toronto airport (2017)

Ministry of Transportation Ontario

  • Needs analysis and VE of the commercial vehicle inspection facilities (2005)
  • Functional performance specification of the 407 Transitway (2008)
  • Needs analysis of the potential sites for vehicle inspections (2010)

Laval Transit Authority

  • VE of the project to increase capacity at the garage (2010)
  • Needs analysis and VE of the new head office (1995)

Montreal Transit Authority

  • Analyse de la valeur du projet de rénovation de la station de métro Vendôme (2017)
  • Analyse de la valeur du projet d’agrandissement d’un garage et de construction d’un nouveau centre de transport (2011)
  • Analyse de la valeur du projet de réaménagement de la station Berri (2009)
  • Réaménagement du service de la caisse (1994)

Outaouais Transit Authority

  • VE of the rapibus project including runningways, bridges, stations and parkings (2009)

South Shore Transit Authority

  • Needs analysis for a new bus terminus in Longueuil (1995)

Transport Canada

  • Risk analysis associated to the Victoria Bridge (2013)

BBA-QIT

  • VE of electrical projects to increase the capacity at the plant: artery placed underground, network modifications, capacity increase of arteries (2006)

Montreal Urban Community

  • Building and service for a sludge drying process (1993)

Defense Canada

  • VE of a tank wash in Gagetown (1997)

Education

  • VE of the construction project for a new multi-use theatre at Cegep of Old-Montreal and Maison Théâtre (2017)
  • McGill University: new music school (1995)
  • Alberta Infrastructures: VE of the renovation project for a new primary school in Jasper (2008)
  • Laval school board: VE of the professional training center (1996) and Green house complex (1998)

Établissements culturels

  • Le Cube : analyse de la valeur du projet de réfection de l’Église Sainte-Brigide pour y installer le Cube : centre international de recherche et de création en théâtre pour l’enfance et la jeunesse (2019)

Government of Nunavut

  • VE of the construction project for a health center (2014)

Groupe Soprin

  • VE of a multimedia show in La Ronde (1996)

Hydro-Québec

  • VE of the industrial energy management program (1996)
  • VE of the construction projects at Rapides-des-Coeurs and Rapides-de-la-Chaudière power plants (1994)
  • VE of the construction project of a dam, a road and a power plant on the Calima river in Columbia (1994)
  • VE of the construction projects of power plants in Baie-St-Paul and Kapibouska (1993)
  • VE of the renovation project for the distribution network in Hampstead (1993)
  • VE of the renovation of the Larocque bridge (1993) Needs analysis for the quality assurance process
  • VE of the building realization process
  • VE of the Sorel head office

Logistec Arrimage

  • Refrigerated warehouse (1996)

RIO

  • VE of the Olympic tower renovation project (2017)

Infrastructures Québec

  • Analyse de la valeur du projet d’agrandissement du Musée des Arts Contemporains de Montréal (2018)
  • Analyse de la valeur du projet d’agrandissement de l’Institut de Cardiologie de Montréal (2017)
  • AV de la réfection de l’esplanade de la Place des Arts (2014)
  • AV de l’Ilôt Voyageur (2014)
  • AV du CHSLD de St-Jérôme (2014)
  • AV du projet de réfection du stationnement intérieur Marie-Guyart (2014)
  • Rénovation de l’ITHQ (2013)
  • Rénovation de l’enveloppe de l’édifice Fullum (2013)
  • Analyse de la valeur du projet d’agrandissement de l’Hôtel-Dieu de Québec (2012)
  • Rénovation de l’édifice Wilder (2011)
  • AV du projet d’agrandissement de l’Hôpital général juif (2011)
  • AV de l’Hôpital du Haut-Richelieu – rénovation de l’urgence et des soins intensifs (2009)
  • AV de l’Hôpital Lasalle – agrandissement de l’urgence (2009)
  • Centre de détention de Hull (1992)
  • Tribunal de la Jeunesse (1995)

Tecsult/Aecom

  • VE of the construction project of a hangar to test test engines, Pratt & Whitney (2008)
  • VE of the construction project of the international airport in Dakar (2008)
  • VE of the renovation project of the neonatalogy department, Sainte-Justine hospital (2007)

Analyses of Products and Processes

Alcan primary metal

  • VE of the new plant for the new AP50 process: pedestrian paths, roads, telecom and casting center (2007-08)
  • VE of the SEED new casting process (2005)
  • VE of a new aluminum recuperation process (1996)

CERIU

  • VE of new anchoring mechanism for conduits suspended under bridges (2003)
  • VE of multi urban networks gallery (2006)

Frigidaire Canada and USA (1995-2000)

  • VE of many components
  • Needs analysis and VE of a new range
  • Needs analysis of a new cooking surveillance mechanism

Hatch – Rio Tinto Iron and Titanium

  • Choix technologique de reconstruction de four, selon la valeur créée (2019)
  • Analyse de la valeur d’un projet d’installation de nouveaux fours (2012)
  • Analyse fonctionnelle d’une nouvelle installation de fours (2011)
  • Analyse fonctionnelle d’un nouveau procédé de lixiviation (2011)
  • Analyse fonctionnelle d’un projet QMM-Phase 2 et relocalisation d’une fonderie (2010)
  • Analyse fonctionnelle et recherche d’opportunités pour le projet Tio2050 (2010)
  • Analyse fonctionnelle du projet de gestion des stériles – mine Havre St-Pierre (2010)
  • Analyse de la valeur des dépoussiéreurs, QIT (2007)
  • Analyse fonctionnelle d’un projet de développement de nouveau processus  (2009)
  • Analyse de la valeur du projet d’augmentation de la capacité de l’usine de potasse de Mosaic à Colonsay, Alberta (2008)
  • Analyse de la valeur des projets suivants dans le cadre de l’augmentation de capacité de l’usine de QIT à Sorel : quai, transfert de minerai, convoyeurs, fours, refroidissement, Usine ALP (Acid leach plant), filtration et recirculation des fines, QMM général, QMM gaz CO,  usine SPP, dôme de scorie, refroidissement (2005-2006)

Hydro-Québec

  • VE of the industrial energy management program (1996)
  • VE of the construction projects at Rapides-des-Coeurs and Rapides-de-la-Chaudière power plants (1994)
  • VE of the construction project of a dam, a road and a power plant on the Calima river in Columbia (1994)
  • VE of the construction projects of power plants in Baie-St-Paul and Kapibouska (1993)
  • VE of the renovation project for the distribution network in Hampstead (1993)
  • VE of the renovation of the Larocque bridge (1993) Needs analysis for the quality assurance process
  • VE of the building realization process
  • VE of the Sorel head office

Iron Ore company of Canada

  • VE of the capacity increase project at the Labrador City mine and Sept-Iles port: steam production plant, water consumption, crushers, mineral delivery, electrical sub-station, ship loading, thickener and spirals, billet plant and closing the Carol Lake installations (2008 and 2015

Lightolier

  • Failure mode analyses (2000)
  • BRP
  • Design-for-manufacturing and design-for –assembly workshops (1999-2001)
  • Functional performance specification for personal water crafts, ski-doos, ATV, systems and accessories (1998+)
  • Bombardier Transit
  • VE of the HVAC system, New-Jersey project (1995)
  • Needs analysis of many projects: Montreal-Two Mountains (1992), Ankara (1992) Toronto (1992), Vancouver (1993), Mexico (1993), Kuala Lumpur (1994), North east corridor High speed train (1996)
  • Needs analysis for a high-speed bogie (1995)
  • Revision of the design process to include function analyses (1992)

Nortel

VE of the following products:

  • OM5K and OME 4x10G (2007)
  • Corner Stone Voice (1996)
  • Cabinet S100E (1995)
  • OPC (1995)
  • Project Pegasus (1995)

Novabus

Ontario Power Generation

  • VE of the heat exchanger program (2008)
  • VE of a welding repair process (2008)
  • VE of the auxiliary power heating (2007)
  • VE of the air conditioning in the plant (2007)
  • VE of the Main Steam Line Break process (2007)
  • VE of a waste removal system for the cooling water at Darlington plant (2007)

Pratt & Whitney Canada inc.

  • VE of the following components and aircraft engines : (1996 10 1997) : PW 150, PW 206D, PW 306, PW 500, PW 600, PT 6

Prévost Car

  • VA and creativity sessions – Windshield system, staircase, cooling system (2000)
  • Definition of the concurrent engineering process (1999)

Rio Tinto

  • VA of the Roughrider mine (2013)
  • VA of the reopening of the Resolution copper mine in Arizona (2016)

Simtran

  • Function analysis and FPS for 3 training simulators, hardware and software, for the DoD (1997)
  • VE of a training simulator, mechanical and electrical components (1998)
  • Optimization of business processes (1998)

STM

  • Needs analysis for a maintenance platform and a tow truck (2011)
  • Needs analysis for a midibus (2010)
  • Needs analysis for the reservation system for adapted transportation (2010)

Thomas & Betts

  • Analyse de la valeur du produit Steel Picto (2016)
  • Analyse de la valeur d’une nouvelle marette (2016)
  • Ajouter : Analyse de la valeur d’un système d’éclairage industriel Haute Performance (2015)
  • AV du mini inverter (2014)
  • AV du Nexus (2013)
  • AV du Nema Combo (2008)
  • AMDEC des produits Led Strip et Phantom (2008)
  • AF d’un nouveau boîtier pour murs en béton (2006)
  • AV des chemins de câble (2005)
  • AMDEC de plusieurs produits
  • Analyse de la valeur d’un mini inverter (2014)
  • AMDEC d’un produit d’éclairage d’urgence(2008)
  • AMDEC d’un réceptacle de compteur d’électricité (2006)
  • Analyse des besoins d’un réceptacle de compteur (2005)
  • AMDEC d’un réceptacle de compteur d’électricité (2006)
  • Analyse des besoins et AMDEC d’un système d’éclairage d’urgence(2004)
  • Optimisation du système de chemins de câbles (2005)
  • Analyse des besoins d’une boîte de jonction(2004)

Vapor Rail

  • Analyse fonctionnelle d’une porte de train Haute Vitesse (2016)
  • Analyse de la valeur d’un opérateur de porte (2012)

Zinc Électrolytique du Canada

  • VA of the circulation on the Valleyfield site (2014)
  • VA of the Cadmium process (2012)
  • VA of the Manganese process (2011)
  • VA of the dithionite process (2010)
  • VA of the electrolyte supply process (2010)

Analysis of systems, services and business processes

Hydro-Québec

  • VA of the industrial energy management process
    • VA of the needs in quality assurance
    • VA of the building realisation process

IBM Canada

  • VA of the HR Consultant position (2006)
  • VA of the training process for maintenance personnel (2004)
  • VA Of the quality control process (2000)

MTO

  • Contract management system (2007)
  • Optimization of the Highway management department (2010)
  • GIS information system (2008)
  • Traffic volume information system (2014)

STM

  • Needs analysis of the adapted transportation reservation system (2010)

Ville de Calgary

  • Analyse de la valeur du projet de refonte du système OWAMS, système de gestion des eaux de la ville (2018)

Union Européenne de Radio-Télévision

  • IT projects priority setting, based on value creation (2017)

Formations

Systra Philippines

  • Formation VMF1 de 2 groupes de 20 personnes du gouvernement des Philippines (2019)

Budapest University of Technology and Economics

  • Formation de 3 jours sur le value management dans le secteur de l’immobilier (2018)

Haute École de Gestion de Genève

  • Formation 2 jours sur le Value Management (2017 et 2019)

Université de Sherbrooke

  • Formation VMF1 (2019)

Université de la Valeur, Genève, Suisse

  • Formation VMF1 (2017 et 2018)

To Reach Us

Lucie Parrot, ing. M.ing., CVS-Life

514-683-3437

lucie@martin-parrot.com

Write Us

13 + 12 =

Share This